Motorists should be advised of changed traffic conditions as night work begins on the Mitchell Highway near Wellington.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
New pavement work, including asphalting, will be carried out between the Maryvale Creek Bridge and the Bodangora Creek Bridge.
The maintenance work begins on Tuesday, November 9 and will be carried out between 6pm and 6am.
READ ALSO:
Work is expected to be completed by Friday, November 12, weather permitting.
Single lane closures, traffic control and reduced speed limits of 40 km/h will be in place for the safety of workers and motorists.
Motorists are advised to drive to the conditions, allow up to 10 minutes extra travel time and follow the directions of signs and traffic control.
Transport for NSW thanks motorists for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.